We have been making progress that past few weeks... although it seems like most of the time we have been making more work. We used to have a functional bathroom and now it is far from that. The walls have had a lot of work done on them and are now painted. The bathroom is ready to have plumbing re-routed and the floors have all had a rough sand.
|
The outer layer of wall paper was removed then the walls were skimmed and primed. |
|
Our green room. The rest of the upstairs is a light tan. |
|
The built in cabinet in the hallway was removed to make room for the one piece tub/shower unit to get in. |
|
|
|
All of the tile on the walls and tub surround was removed. | | |
|
|
|
The view from the living room once the sheetrock had been removed. |
|
|
|
|
The tub was cast-iron which was a challenge to remove because of the weight. |
|
A sledge hammer did the trick. |
|
The wallpaper border from around the top of the kitchen wall was removed and metal corners were put on the doorway and mudded. |
|
The kitchen without the wallpaper border above the cabinets. |